Revit

How to Merge Levels in Revit?

Understanding Levels in Revit

Levels in Revit are crucial for organizing vertical elements within your architectural design. They establish points of reference for floors, ceilings, and other architectural features, allowing you to maintain consistency and accuracy across various views in your project.

Steps to Merge Levels in Revit

To effectively merge levels in Revit, follow these detailed steps:

Step 1: Access the Section or Elevation View

Before merging levels, ensure you are in the correct view. Open a section or elevation view where the levels you intend to merge are visible. This provides a clear perspective on how the levels relate to one another within your model.

Step 2: Activate the Join Geometry Tool

Navigate to the ribbon and select the Modify tab. Locate the Geometry panel and click on the “Join” drop-down menu. From the options that appear, select “Join Geometry.” This tool will allow you to connect two level instances together seamlessly.

Step 3: Choosing Multiple Join Options (Optional)

If you desire to join multiple geometry instances to a single selected instance, you can enable the “Multiple Join” feature located on the Options Bar. This option helps in streamlining the process if there are several levels to merge at once.

Step 4: Select the First Level to Merge

Click to select the first level you want to join. This can be a horizontal line representing a floor or a ceiling level. The selection should highlight to signify that Revit recognizes your chosen geometry.

Step 5: Select the Level(s) to Merge With

After selecting the first level, click on the additional level(s) you wish to merge with it. Make sure that the levels you are joining have overlapping extents; otherwise, the merge may not take effect correctly.

Step 6: Confirm the Merge Action

Once you have selected the intended levels, confirm the merge. Revit will integrate the selected levels, creating a single entity that maintains the properties and positioning of the original components.

Adjusting Merged Levels

If adjustments are needed after merging, you can modify the properties of the combined level. Right-click on the merged level symbol in the section or elevation view and choose “Properties” to edit its height or other attributes as required.

Frequently Asked Questions (FAQ)

1. Can I unmerge levels once they are joined?

Yes, to unmerge levels, you can use the “Ungroup” option found in the Modify tab if the levels are grouped. If that doesn’t apply, you may need to manually adjust the properties of the individual levels to revert them to their original state.

2. Will merging levels affect my floor plans?

Merging levels alters the vertical relationships in your project, which can impact how your floor plans are displayed. Be sure to double-check your plans to ensure everything aligns correctly after the merge.

3. How do I check if levels are merged correctly?

To verify the successful merge of levels, toggle between different views (such as 3D and floor plans) and examine the level markers. They should reflect the changes accurately, indicating the merge was successful.

About the author

Wei Zhang

Wei Zhang

Wei Zhang is a renowned figure in the CAD (Computer-Aided Design) industry in Canada, with over 30 years of experience spanning his native China and Canada. As the founder of a CAD training center, Wei has been instrumental in shaping the skills of hundreds of technicians and engineers in technical drawing and CAD software applications. He is a certified developer with Autodesk, demonstrating his deep expertise and commitment to staying at the forefront of CAD technology. Wei’s passion for education and technology has not only made him a respected educator but also a key player in advancing CAD methodologies in various engineering sectors. His contributions have significantly impacted the way CAD is taught and applied in the professional world, bridging the gap between traditional drafting techniques and modern digital solutions.